Analysis of Cost Overrun and Schedule Delays of Infrastructure Projects in Low Income Economies: Case Studies in Ethiopia
Today, several developing countries struggle to improve the cost and time performances of major infrastructure works due to various reasons. Cost overrun and delay are one of the major challenges being faced by the construction and infrastructure sector. Hence, the aim of this study is to explore th...
Saved in:
Main Authors: | Solomon Melaku Belay, Seifu Tilahun, Mitiku Yehualaw, Jose Matos, Helder Sousa, Endalew Temesgen Workneh |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/4991204 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Causes of cost overruns on Zimbabwe’s construction infrastructure projects
by: Tirivavi Moyo, et al.
Published: (2022-12-01) -
Assessing the Causes of Time Overrun in Building and Road Construction Projects: The Case of Addis Ababa City, Ethiopia
by: Adamu Beyene Negesa
Published: (2022-01-01) -
Contact Analysis of Sprag-type Overrunning Clutches
by: Yang Hongtu, et al.
Published: (2023-05-01) -
New Expanding Flexible Ring-type Overrunning Clutch
by: Du Li, et al.
Published: (2015-01-01) -
Research of the POP-in and out Phenomenon of PCE Overrunning Clutch
by: Gai Xiaotao, et al.
Published: (2017-01-01)