Simulation of Ground Settlement Using Plaxis for the Pekanbaru-Padang Toll Road Construction Project: A Detailed Analysis
Geotechnical issues often include settlement and soil bearing capacity, which serve as the foundation for toll roads. Each toll road is designed with specific loads and elevations, which sometimes cannot be supported by the consolidation of the existing soil due to the soft soil characteristics. Soi...
Saved in:
| Main Authors: | Muhammad Sultan Mubaraq Saragih, Tika Ermita Wulandari |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Lembaga Penelitian dan Pengabdian Masyarakat (LPPM), Universitas Andalas
2024-11-01
|
| Series: | Andalasian International Journal of Applied Science, Engineering, and Technology |
| Online Access: | https://aijaset.lppm.unand.ac.id/index.php/aijaset/article/view/181 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Effects of toll road construction on local road projects in Indonesia
by: I.G. Ayu Andani, et al.
Published: (2019-03-01) -
Risk analysis of PPP financing for toll road project
by: Suwandairi Y.D., et al.
Published: (2025-01-01) -
EXPERIENCE OF COMMUNICATION IN LAND ACQUISITION OF WEST SUMATRA TOLL ROAD DEVELOPMENT PROJECT
by: Emeraldy Chatra, et al.
Published: (2024-12-01) -
DETAILS’ REPAIR OF CONSTRUCTION AND ROAD MACHINES: FLUCTUATIONS’ MODELLING
by: V. E. Ovsyannikov, et al.
Published: (2019-11-01) -
Determining the Operator for the Public Toll Road
by: Bin Shang, et al.
Published: (2021-01-01)