Key point of NFV hardware resource pool planning and construction

Major operators have been deploying NFV in succession,after hardware and software decoupling of NFV,hardware and software need to be separately planned and constructed.Based on the initial construction requirements of NFV deployment,the key factors were analyzed which should be considered in the pla...

Full description

Saved in:
Bibliographic Details
Main Authors: Lei SHEN, Fang WANG, Lihua WU
Format: Article
Language:zho
Published: Beijing Xintong Media Co., Ltd 2018-06-01
Series:Dianxin kexue
Subjects:
Online Access:http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2018201/
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841530373547229184
author Lei SHEN
Fang WANG
Lihua WU
author_facet Lei SHEN
Fang WANG
Lihua WU
author_sort Lei SHEN
collection DOAJ
description Major operators have been deploying NFV in succession,after hardware and software decoupling of NFV,hardware and software need to be separately planned and constructed.Based on the initial construction requirements of NFV deployment,the key factors were analyzed which should be considered in the planning and construction of the hardware resource pool and the machine room infrastructure.The calculation,storage,network equipment matching requirements were expounded.And the blade and rack service was compared.The hardware and network configuration of two layers and SDN networks were enhanced by the hardware,magnetic array and distributed storage.The hardware configuration mode and key considerations were studied.The hardware redundancy requirements under different scenes were analyzed,and the key requirements of the NFV hardware pool planning and construction were obtained.
format Article
id doaj-art-630ca79f71b1472193f6577aba995c6d
institution Kabale University
issn 1000-0801
language zho
publishDate 2018-06-01
publisher Beijing Xintong Media Co., Ltd
record_format Article
series Dianxin kexue
spelling doaj-art-630ca79f71b1472193f6577aba995c6d2025-01-15T03:04:41ZzhoBeijing Xintong Media Co., LtdDianxin kexue1000-08012018-06-013410711459595521Key point of NFV hardware resource pool planning and constructionLei SHENFang WANGLihua WUMajor operators have been deploying NFV in succession,after hardware and software decoupling of NFV,hardware and software need to be separately planned and constructed.Based on the initial construction requirements of NFV deployment,the key factors were analyzed which should be considered in the planning and construction of the hardware resource pool and the machine room infrastructure.The calculation,storage,network equipment matching requirements were expounded.And the blade and rack service was compared.The hardware and network configuration of two layers and SDN networks were enhanced by the hardware,magnetic array and distributed storage.The hardware configuration mode and key considerations were studied.The hardware redundancy requirements under different scenes were analyzed,and the key requirements of the NFV hardware pool planning and construction were obtained.http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2018201/hardware resource poolcomputingstoragenetworkdata center
spellingShingle Lei SHEN
Fang WANG
Lihua WU
Key point of NFV hardware resource pool planning and construction
Dianxin kexue
hardware resource pool
computing
storage
network
data center
title Key point of NFV hardware resource pool planning and construction
title_full Key point of NFV hardware resource pool planning and construction
title_fullStr Key point of NFV hardware resource pool planning and construction
title_full_unstemmed Key point of NFV hardware resource pool planning and construction
title_short Key point of NFV hardware resource pool planning and construction
title_sort key point of nfv hardware resource pool planning and construction
topic hardware resource pool
computing
storage
network
data center
url http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2018201/
work_keys_str_mv AT leishen keypointofnfvhardwareresourcepoolplanningandconstruction
AT fangwang keypointofnfvhardwareresourcepoolplanningandconstruction
AT lihuawu keypointofnfvhardwareresourcepoolplanningandconstruction