Design and Construction of Hydraulic Mud Fill Foundation Treated by Vacuum Prepressing Method Combining with Dumping
Saved in:
Main Author: | 周雷靖 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2001-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47672851&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of Effects of Reinforcement of Foundation of Lok Ma Chau Water Gate by Vacuum Prepressing in Combination with Dumping
by: 栾新顺, et al.
Published: (2001-01-01) -
Application of Cofferdam built with Sand-filled Bages to Mud Foundation
by: JIANG Hong-da, et al.
Published: (2005-01-01) -
Dynamic Response Analysis of Pile Group Foundation of Super-Giant Sewage Treatment Structure on Hydraulic Fill Foundation
by: Yi Huang, et al.
Published: (2022-01-01) -
RESEARCH AND DESIGN OF MULTI-DIRECTIONAL DUMPING CONSTRUCTION IN TRUCKS
by: Thong Duc HONG, et al.
Published: (2023-06-01) -
Analysis of the Braking Performance of the Hydraulic Retarder in Mining Dump Truck based on AMESim
by: Deng Lin
Published: (2016-01-01)