Quantitative Assessment of Gaseous Effluents during Routine Operation: A Comparative Study of Planned Nuclear Power Plants at Lubiatowo-Kopalino and Pątnów Sites in Poland
On September 2021, Polish government declared that six pressurized water reactors with combined capacity of 6–9 GWe will be built by 2040 to reduce Poland’s reliance on coal. Due to the adopted schedule, construction of the first nuclear power plant will begin in 2026, with the first reactor capacit...
Saved in:
Main Authors: | Edyta Agata Macieja, Juyoul Kim |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2024-01-01
|
Series: | Science and Technology of Nuclear Installations |
Online Access: | http://dx.doi.org/10.1155/2024/8699926 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Public Health Effects of Radioactive Airborne Effluents from Nuclear and Coal-Fired Power Plant
by: Boldsaikhan Purevsuren, et al.
Published: (2021-01-01) -
Enhancing Resilience through Nuclear Emergency Preparedness at El Dabaa Site
by: Waad Saleh, et al.
Published: (2024-01-01) -
On the Use of Quantitative Methods in Accounting Research in Poland
by: Marek Gruszczyński
Published: (2022-11-01) -
Microbial dynamics of acute pancreatitis: integrating culture, sequencing, and bile impact on bacterial populations and gaseous metabolites
by: Agnieszka Chmielarczyk, et al.
Published: (2025-02-01) -
Economic impact of road accidents on costs of employee turnover: A quantitative study from Poland
by: Agata Małgorzata Jaździk-Osmólska, et al.
Published: (2024-12-01)