Day-ahead Clearing Method for High-proportion Hydropower Electricity Market
How to handle the complex characteristics of cascade hydropower and solve the competitive spillage and power shortage problem is one of the key issues in the clearing of the high-proportion hydropower day-ahead spot electricity market.Therefore,combined with the project in Yunnan,this paper proposes...
Saved in:
Main Authors: | ZHANG Yang, SHEN Jianjian, ZHAO Qihao, XIE Mengfei, JIA Zebin |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2023-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.11.005 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Review on the Method of Compensation Benefit Allocation for Cascade Hydropower Stations
by: LI Yinghai, et al.
Published: (2020-01-01) -
Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy
by: LI Chonghao, et al.
Published: (2023-01-01) -
Investigation and Assessment of the Influence of Cascaded Hydropower Plants on Fish Resources in the Qiuxiangjiang River
by: LIU Jie, et al.
Published: (2020-01-01) -
A Refined Short-term Scheduling Method Considering the Difference of Peak-shaving Performance of Hydropower Stations
by: HUANG Kui, et al.
Published: (2024-01-01) -
Cumulative Effect of Cascade Hydropower Development on Ecological Environment of Main Stream of Jinsha River
by: ZHOU Yang, et al.
Published: (2024-12-01)