United Deployment of the Key Reservoirs Solved the Five Major Water Problems in the Pearl River Basin
Saved in:
Main Author: | LIU Zhi-sen |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2007-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47664601&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Introduction of the Middle Sized Reservoir Construction Planning in the Pearl River Basin
by: LI Qing-lin
Published: (2006-01-01) -
Comments on Pearl River Key Reservoir Group Water Allocation Scheme and Technology
by: XIE Shuqing
Published: (2007-01-01) -
Probe into Proimary Problem of Comprehensive Planning in the Pearl River Basin
by: 范锦春
Published: (2001-01-01) -
Study on Effectiveness of Supervision and Inspection of Small Reservoirs in Pearl River Basin and Reflection on Countermeasures
by: ZHAO Bohua, et al.
Published: (2023-01-01) -
Comparative Study on Water Resources Carrying Capacity of Key River Basins in the Pearl River Region
by: JIN Zhanwei, et al.
Published: (2023-01-01)