Calculation of Water Discharge from River Barrage in Chaozhou Water Supply Project in Guangdong
Saved in:
Main Author: | LIN Yun-quan |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2008-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47664491&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Practice and Experience of Construction and Management of Chaozhou Water Supply Project in Guangdong
by: FU Neng-jiang, et al.
Published: (2005-01-01) -
Layout and Tests of Xixi Junction of the Chaozhou Water Supply Project
by: HUANG Zhi-min, et al.
Published: (2005-01-01) -
Construction Technology of River Bottom Protection with Soft Foundation in Chaozhou Water Supply Pivot Project
by: 陈克振, et al.
Published: (2003-01-01) -
Approach to Problems Related to the Closure Work of Chaozhou Water Supply Project
by: 曾陈平
Published: (2002-01-01) -
Hydrometry of Phase I Closure of Chaozhou Water Supply Project and Analysis of Results
by: 郑道贤
Published: (2003-01-01)