Structural Analysis of Buried Pipeline of Huanglongtan Hydropower Station
Saved in:
Main Authors: | 苏凯, 伍鹤皋, 郝鹏, 朱雄, 王辉, 高宇 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2003-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47670457&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
On the Design Criteria for Buried Steel Penstock of Hydropower Station
by: WANG Jin-long, et al.
Published: (2001-01-01) -
Explosive Performance Assessment of Buried Steel Pipeline
by: Seyed-Mohammad Seyed-Kolbadi, et al.
Published: (2021-01-01) -
Application of Flow Regime Automatic System to Douyan Hydropower Station
by: 陈礼元, et al.
Published: (2001-01-01) -
Design of Metallic Structure of Penglatan Hydropower Station
by: 黎子球
Published: (2002-01-01) -
Analysis of Accident of Inlet Gate of Unit 2 of Changhu Hydropower Station
by: 苏全斌, et al.
Published: (2002-01-01)