Stability Study of Shield Tunnel Excavation Face Induced by Shield Chamber Pressure Entering in Shallow-Buried Sand Stratum
[Objective] Solve the problem of excavation surface stability during shield tunneling with pressure entry in shallow-buried sandy stratum.To solve the problem of the stability of tunnel face of shield tunnel with pressure into the chamber in shallow buried sandy soil stratum. [Method] The limit supp...
Saved in:
Main Author: | GE Jun |
---|---|
Format: | Article |
Language: | zho |
Published: |
Urban Mass Transit Magazine Press
2025-01-01
|
Series: | Chengshi guidao jiaotong yanjiu |
Subjects: | |
Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.016.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Research on blow-out of shield tunnel in sandy soil with shallow burial
by: Yong-Xiang Shi, et al.
Published: (2025-01-01) -
Three-dimensional discrete element analysis of the excavation face stability of deep-buried shield tunnels
by: Xin Huang, et al.
Published: (2025-02-01) -
Unstuck Technology for EPB/TBM Dual Mode Shield Machine Stuck in Rock Stratum
by: DUAN Yueqiang
Published: (2025-01-01) -
Study on Stability of Small Clearance Shield Tunnel Excavation Face
by: GAO Qi
Published: (2025-01-01) -
Machine learning-based forecasting of ground surface settlement induced by metro shield tunneling construction
by: Qiankun Wang, et al.
Published: (2024-12-01)