Failure Mechanism and Mitigation Measures of the G1002 Electricity Pylon Landslide at the Jinping I Hydropower Station
On August 29 and 30, 2012, local extreme rainfalls struck the construction area of the Jinping I Hydropower Station, Xichang, China, and triggered many geohazards. The upper region of the left valley slope 200 m downstream of the dam failed and slid, exposing the D-pile of the G1002 electricity pylo...
Saved in:
Main Authors: | Gang Luo, Yutian Zhong, Yuanxiang Yang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8820315 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Experimental Study on Deformation Monitoring of Large Landslide in Reservoir Area of Hydropower Station Based on GB-InSAR
by: Yanhui Guo, et al.
Published: (2021-01-01) -
Implementation of Security Standardization in Construction of No.3 and No.4 West Diversion Tunnel in Jinping Phase 2 Hydroelectric Station
by: WANG Zhi, et al.
Published: (2010-01-01) -
Analysis and Design of Electricity Consumption of Power House in Hydropower Station with Bulb Turbine
by: ZHI Yong-ming, et al.
Published: (2009-01-01) -
Construction of Vibro-Pile in Machine-electric Equipment Warehouse in Jinghong Hydropower Station
by: JI Hong-ke, et al.
Published: (2010-01-01) -
Fatigue characteristics of deep excavation-disturbed jinping marble
by: Anlin Zhang, et al.
Published: (2025-01-01)