Design of the Intake Tower in front of the Diversion Channel in Letan Reservoir Irrigation District in Guangxi
Saved in:
Main Author: | WU Qiang |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2007-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47665259&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Stress Analysis of Intake Tower s Foundation of Baise Hydro power Station
by: WU Sheng
Published: (2006-01-01) -
Application of ZDM Software to Designing of Channel Alterations in Irrigation Zones
by: Zeng Chu-wu
Published: (2012-01-01) -
Engineering Geologic Problems and Treatment Measures for Intake Towers Foundation of Baise Hydropower Station
by: YU Hua-zhu
Published: (2006-01-01) -
General Design Layout of Metal Structure of a Reservoir for Layered Water Intake
by: SHAO Shipeng, et al.
Published: (2023-01-01) -
Microsatellite analyses reveal genetic diversity and population structure of Cipangopaludina chinensis in Guangxi, China
by: Xiao-kai Wei, et al.
Published: (2025-03-01)