SAMPLING OF THE PLAN OF REPAIRS OF THE MAIN EQUIPMENT IN THE ELECTRICAL POWER SYSTEM
The main aspects of creation of the formal-and-functional mathematical models supporting a system for prompt resolution of repair requires in a complex electric power system are considered in the article. In accordance with the standards of repairs, inspections, replacement of elements of the main e...
Saved in:
Main Author: | O. I. Alexandrov |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2017-07-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Subjects: | |
Online Access: | https://energy.bntu.by/jour/article/view/1075 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
OPTIMIZATION OF INVESTMENT RESOURCES DURING REPAIR OF POWER ENTERPRISE'S EQUIPMENT
by: A. Ievlev
Published: (2017-05-01) -
A Refined Short-term Scheduling Method Considering the Difference of Peak-shaving Performance of Hydropower Stations
by: HUANG Kui, et al.
Published: (2024-01-01) -
Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy
by: LI Chonghao, et al.
Published: (2023-01-01) -
Water Supply Scheduling for Cross-basin Reservoir Groups Based on Improved Scheduling Diagram
by: ZHAO Siqi, et al.
Published: (2023-01-01) -
Energy optimization strategy on the IoT equipment based on the scheduler
by: Wanfang ZHAO, et al.
Published: (2019-03-01)