Experience in the Construction of Wulichong Blind Valley Reservoir
Saved in:
Main Authors: | DENG De-ren, ZHANG Bang-ren, WU Mei-rao |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2000-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47675306&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction Supervision of Seepage Proof Curtain by High-pressure Grouting of Wulichong Reservoir
by: 张九德, et al.
Published: (2000-01-01) -
Present Situation of Reservoir Flood Control in the Pearl River Valley and Problems in Flood Regulation
by: 何治波
Published: (2003-01-01) -
Strengthening the Construction and Management of Water Projects in the Pearl River Valley
by: 孙建伟
Published: (2002-01-01) -
Experiments and Modeling on the Influence of Interfacial Tension on Imbibition Height of Low-Permeability Reservoir
by: Xiaoxia Ren, et al.
Published: (2020-01-01) -
Design and Construction of an Electronic Stick for the Blind and Deaf.
by: Changa, Andrew
Published: (2025)