Study on the Bottom Diversion Outlets of the Three Gorges Project

Construction of the Three Gorges Project is divided into three stages. The second stage is to close the left bank main riverbed, divert the stream to the right bank open channd and build the spillway section in the mian river bed and the powerhouse on theleft bank. The spillway section will be provi...

Full description

Saved in:
Bibliographic Details
Main Author: TANG Li
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2001-01-01
Series:Renmin Zhujiang
Online Access:http://www.renminzhujiang.cn/thesisDetails?columnId=47674038&Fpath=home&index=0
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841531320180670464
author TANG Li
author_facet TANG Li
author_sort TANG Li
collection DOAJ
description Construction of the Three Gorges Project is divided into three stages. The second stage is to close the left bank main riverbed, divert the stream to the right bank open channd and build the spillway section in the mian river bed and the powerhouse on theleft bank. The spillway section will be provided with three rows of release outlets of which 22 bottom outlets will be used for construction diversion in the third stage, hence, it is an important structure for ensuring the safety in the construction of of the right bank powerhouse in the third stage and the safety in the operation of the left bank powerhouse.
format Article
id doaj-art-4032c68136704251a4998e2d8d4a388c
institution Kabale University
issn 1001-9235
language zho
publishDate 2001-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-4032c68136704251a4998e2d8d4a388c2025-01-15T02:50:50ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352001-01-012247674038Study on the Bottom Diversion Outlets of the Three Gorges ProjectTANG LiConstruction of the Three Gorges Project is divided into three stages. The second stage is to close the left bank main riverbed, divert the stream to the right bank open channd and build the spillway section in the mian river bed and the powerhouse on theleft bank. The spillway section will be provided with three rows of release outlets of which 22 bottom outlets will be used for construction diversion in the third stage, hence, it is an important structure for ensuring the safety in the construction of of the right bank powerhouse in the third stage and the safety in the operation of the left bank powerhouse.http://www.renminzhujiang.cn/thesisDetails?columnId=47674038&Fpath=home&index=0
spellingShingle TANG Li
Study on the Bottom Diversion Outlets of the Three Gorges Project
Renmin Zhujiang
title Study on the Bottom Diversion Outlets of the Three Gorges Project
title_full Study on the Bottom Diversion Outlets of the Three Gorges Project
title_fullStr Study on the Bottom Diversion Outlets of the Three Gorges Project
title_full_unstemmed Study on the Bottom Diversion Outlets of the Three Gorges Project
title_short Study on the Bottom Diversion Outlets of the Three Gorges Project
title_sort study on the bottom diversion outlets of the three gorges project
url http://www.renminzhujiang.cn/thesisDetails?columnId=47674038&Fpath=home&index=0
work_keys_str_mv AT tangli studyonthebottomdiversionoutletsofthethreegorgesproject