Study on the Bottom Diversion Outlets of the Three Gorges Project
Construction of the Three Gorges Project is divided into three stages. The second stage is to close the left bank main riverbed, divert the stream to the right bank open channd and build the spillway section in the mian river bed and the powerhouse on theleft bank. The spillway section will be provi...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2001-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47674038&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841531320180670464 |
---|---|
author | TANG Li |
author_facet | TANG Li |
author_sort | TANG Li |
collection | DOAJ |
description | Construction of the Three Gorges Project is divided into three stages. The second stage is to close the left bank main riverbed, divert the stream to the right bank open channd and build the spillway section in the mian river bed and the powerhouse on theleft bank. The spillway section will be provided with three rows of release outlets of which 22 bottom outlets will be used for construction diversion in the third stage, hence, it is an important structure for ensuring the safety in the construction of of the right bank powerhouse in the third stage and the safety in the operation of the left bank powerhouse. |
format | Article |
id | doaj-art-4032c68136704251a4998e2d8d4a388c |
institution | Kabale University |
issn | 1001-9235 |
language | zho |
publishDate | 2001-01-01 |
publisher | Editorial Office of Pearl River |
record_format | Article |
series | Renmin Zhujiang |
spelling | doaj-art-4032c68136704251a4998e2d8d4a388c2025-01-15T02:50:50ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352001-01-012247674038Study on the Bottom Diversion Outlets of the Three Gorges ProjectTANG LiConstruction of the Three Gorges Project is divided into three stages. The second stage is to close the left bank main riverbed, divert the stream to the right bank open channd and build the spillway section in the mian river bed and the powerhouse on theleft bank. The spillway section will be provided with three rows of release outlets of which 22 bottom outlets will be used for construction diversion in the third stage, hence, it is an important structure for ensuring the safety in the construction of of the right bank powerhouse in the third stage and the safety in the operation of the left bank powerhouse.http://www.renminzhujiang.cn/thesisDetails?columnId=47674038&Fpath=home&index=0 |
spellingShingle | TANG Li Study on the Bottom Diversion Outlets of the Three Gorges Project Renmin Zhujiang |
title | Study on the Bottom Diversion Outlets of the Three Gorges Project |
title_full | Study on the Bottom Diversion Outlets of the Three Gorges Project |
title_fullStr | Study on the Bottom Diversion Outlets of the Three Gorges Project |
title_full_unstemmed | Study on the Bottom Diversion Outlets of the Three Gorges Project |
title_short | Study on the Bottom Diversion Outlets of the Three Gorges Project |
title_sort | study on the bottom diversion outlets of the three gorges project |
url | http://www.renminzhujiang.cn/thesisDetails?columnId=47674038&Fpath=home&index=0 |
work_keys_str_mv | AT tangli studyonthebottomdiversionoutletsofthethreegorgesproject |