Study on Flood Control Dispatching Rehearsal in Shenzhen River Basin
At present,it is difficult to carry out large-scale flood control project construction in Shenzhen River Basin.Therefore,to ensure the flood control safety of Shenzhen Reservoir and downstream Shenzhen River,this paper follows the requirements of the forecast,early warning,rehearsal,and preplan prop...
Saved in:
| Main Authors: | LENG Yubo, LIU Xunping, LIU Chuan |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2022-01-01
|
| Series: | Renmin Zhujiang |
| Subjects: | |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.12.011 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Post-event Simulation and Analysis of "9.7" Extreme Heavy Rainstorm and Flooding in Shenzhen River Basin
by: LIU Xunping, et al.
Published: (2025-01-01) -
Study on the Influence of Shawan River Interception and Drainage Project on Flood Control and Drainage of Shawan River and Shenzhen Reservoir
by: CHEN Ligui, et al.
Published: (2022-01-01) -
Impact of Extreme Rainstorms on Accessibility of Urban Medical Services and Layout Method of Emergency Points: A Case Study of the Shenzhen River Basin
by: YANG Guang, et al.
Published: (2025-01-01) -
City intelligent life: A case study on Shenzhen city intelligent classification of domestic waste
by: Xiao-Yong WEN
Published: (2021-02-01) -
Optimization of Flood Dispatch Scheme in Upstream of Beijiang River Based on Traceability Analysis
by: QIN Yehongping, et al.
Published: (2024-01-01)