Study on Flood Control Dispatching Rehearsal in Shenzhen River Basin
At present,it is difficult to carry out large-scale flood control project construction in Shenzhen River Basin.Therefore,to ensure the flood control safety of Shenzhen Reservoir and downstream Shenzhen River,this paper follows the requirements of the forecast,early warning,rehearsal,and preplan prop...
Saved in:
Main Authors: | LENG Yubo, LIU Xunping, LIU Chuan |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2022-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.12.011 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Research and Application of Urban Flood Model in Shenzhen River and Bay Basin
by: LENG Yubo, et al.
Published: (2024-05-01) -
Flood Control Capacity of Shenzhen River Basin during "9·7" Torrential Rainfall
by: ZHOU Hui, et al.
Published: (2024-11-01) -
Study on the Influence of Shawan River Interception and Drainage Project on Flood Control and Drainage of Shawan River and Shenzhen Reservoir
by: CHEN Ligui, et al.
Published: (2022-01-01) -
Resistance Characteristics of Riparian Plants in South China:A Case Study of Shenzhen River
by: ZHENG Shaoping, et al.
Published: (2023-01-01) -
Optimization of Flood Dispatch Scheme in Upstream of Beijiang River Based on Traceability Analysis
by: QIN Yehongping, et al.
Published: (2024-01-01)