Karst Foundation Survey and Leakage Prevention Optimized Design for Xiniu Navigation and Hydropower Junction Project in Lianjiang River
Saved in:
Main Authors: | PAN Feng, YANG Feng |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2007-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47664291&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Research and Application of Visualization Technology of Water Diversion in Hanjiang-Rongjiang-Lianjiang River Water System Connectivity Project
by: LI Jiasheng, et al.
Published: (2021-01-01) -
Present Situation of Water Pollution in the Lianjiang River Basin and Its Control and Management Measures
by: 蔡瑜萱, et al.
Published: (2003-01-01) -
Underground Karst Stratification in Covered Karst Areas Under Control of River Valley Evolution: A Case Study of Baishiyao Hydropower Station
by: CHEN Qijun, et al.
Published: (2023-01-01) -
Analysis on Spatial and Temporal Variation and Influencing Factors of Evapotranspiration in Lianjiang River Basin Based on the Priestley-Taylor Model
by: WEI Xiaocha, et al.
Published: (2020-01-01) -
Probe into Ground Foundation in Karst Region
by: LIANG Yan-hong
Published: (2009-01-01)