Shear Stress Analysis and Crack Prevention Measures for a Concrete-Face Rockfill Dam, Advanced Construction of a First-Stage Face Slab, and a First-Stage Face Slab in Advanced Reservoir Water Storage
Due to the demand in flood season for power generation, the first-stage face slab of a high concrete-face rockfill dam often must be constructed ahead of schedule, and advanced water storage is needed for the reservoir. Since the dam-body filling has not yet been completed at this point, the interna...
Saved in:
Main Authors: | Kongzhong Hu, Jiankang Chen, Dong Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2018-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2018/2951962 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Numerical Simulation on Slabs Dislocation of Zipingpu Concrete Faced Rockfill Dam during the Wenchuan Earthquake Based on a Generalized Plasticity Model
by: Bin Xu, et al.
Published: (2014-01-01) -
Controlled Blasting Test in Quarrying for Concrete Faced Rockfill Dam of Dahe Reservoir
by: 马忠旭
Published: (2003-01-01) -
Analysis of Deformation Characteristics of Face Rockfill Dam with Crest Overflow in Feigu Reservoir During Operation
by: ZHAO Zejin, et al.
Published: (2022-01-01) -
Simulation Analysis of Thermal Stress of Concrete Face Slab in Rock-fill Dam Based on Unsteady Field
by: GUAN Zhibao, et al.
Published: (2020-01-01) -
Finite-element Stress and Deformation Analysis of a Geomembrane Face Rockfill Dam
by: ZHAO Yuhao, et al.
Published: (2022-01-01)