CALCULATION OF OVERHAUL PERIODS OF WELL INTAKE OPERATION IN VIEW OF WELLS’ DETERIORATION
The paper contains methods of approximate calculation of overhaul periods of well intake operation taking into account the established rate of specific well debit decrease and wells’ mutual influence during the operation.Methods of a full-scale wells’ investigation with the aim to receive the requir...
Saved in:
| Main Authors: | V. V. vashechkin, A. M. Sheyko |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
Belarusian National Technical University
2006-10-01
|
| Series: | Наука и техника |
| Online Access: | https://sat.bntu.by/jour/article/view/1232 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization of the Operation of Groundwater Intakes Using Two-Column Wells
by: V. V. Ivashechkin, et al.
Published: (2022-10-01) -
Basics of Calculation and Design of Two-Column Two-Filter Water Intake Wells
by: V. V. Ivashechkin, et al.
Published: (2021-10-01) -
Methodology for Calculating Specific Expenditure of Acid Reagents for Filter Regeneration of Water-Well Intakes /
by: V. V. Ivashechkin, et al.
Published: (2007-12-01) -
Calculative Principles of Required Pressure for Decolmatation of Pre-Filter Zone of Water Intake Well
by: V. V. Ivashechkin
Published: (2003-10-01) -
ANALYSIS OF WATER INTAKE WELL LONGEVITY IN MINSK
by: A. M. Sheiko, et al.
Published: (2006-02-01)