Analysis of Navigation Problem during Closure of Low-head Hydropower Station
Saved in:
Main Author: | LU Wu-sheng |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2000-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47675255&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Impact of Shuangjiangkou Hydropower Station on the Joint Dispatch of Power Generation and Navigation for Downstream Cascade Reservoirs
by: YANG Yi, et al.
Published: (2024-09-01) -
Analysis of Operation of Feilaixia Hydropower Station in Generation Mode During Early Stage
by: 蔡旭东
Published: (2002-01-01) -
Analysis of Low Orifice Stress in Nansha Hydropower Station in Red River and Structure Design
by: WANG Meng, et al.
Published: (2010-01-01) -
Treatment of Vibration Problem in Hydro-generator Group in Xiangshui Hydropower Station
by: BI Ren-you, et al.
Published: (2009-01-01) -
Impact of Branch Pipe Valve Closure Procedures on Pipeline Water Hammer Pressure: A Case Study of Xinlongkou Hydropower Station
by: Zilong Li, et al.
Published: (2025-01-01)