The Integrated Hydropower Sustainability Assessment in Tajikistan: A Case Study of Rogun Hydropower Plant
Tajikistan has formulated the strategy to rejuvenate the country through hydropower. The Rogun hydropower plant (HPP) is designed as the highest hydropower station, while its sustainability is also questioned due to a lack of comprehensive sustainability evaluation. Considering that the external env...
Saved in:
Main Authors: | Zhao Xu, Yumin Niu, Yangze Liang, Zhigang Li, Atoev Iftikhor |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8894072 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design of Power-house of Changtan Hydropower Plant
by: 李少科
Published: (2004-01-01) -
Thinking of Hydraulic Management in Jinshuitan Hydropower Plant
by: 林周成, et al.
Published: (2003-01-01) -
Investigation and Assessment of the Influence of Cascaded Hydropower Plants on Fish Resources in the Qiuxiangjiang River
by: LIU Jie, et al.
Published: (2020-01-01) -
Repair of Runner of Unit 1 of Baishiyao Hydropower Plant
by: 别艳芝
Published: (2002-01-01) -
Reform of Computer Supervision System in Mengzhouba Hydropower Plant
by: ZHENG Yong
Published: (2010-01-01)