Load switching between main power grid to the backup grid by standard automatic transfer switch

PURPOSE. To develop a variant of the algorithm for the automatic input of the reserve, which consists in transferring the load in case of emergency situations, to make a simulation model in the MatLab® environment corresponding to the developed generalized electrical scheme of the system.METHODS. Wh...

Full description

Saved in:
Bibliographic Details
Main Authors: A. P. Chervonenko, D. A. Kotin, A. V. Rozhko
Format: Article
Language:English
Published: Kazan State Power Engineering University 2022-01-01
Series:Известия высших учебных заведений: Проблемы энергетики
Subjects:
Online Access:https://www.energyret.ru/jour/article/view/1992
Tags: Add Tag
No Tags, Be the first to tag this record!