Load switching between main power grid to the backup grid by standard automatic transfer switch
PURPOSE. To develop a variant of the algorithm for the automatic input of the reserve, which consists in transferring the load in case of emergency situations, to make a simulation model in the MatLab® environment corresponding to the developed generalized electrical scheme of the system.METHODS. Wh...
Saved in:
Main Authors: | A. P. Chervonenko, D. A. Kotin, A. V. Rozhko |
---|---|
Format: | Article |
Language: | English |
Published: |
Kazan State Power Engineering University
2022-01-01
|
Series: | Известия высших учебных заведений: Проблемы энергетики |
Subjects: | |
Online Access: | https://www.energyret.ru/jour/article/view/1992 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of the fleet and evaluation of the switching resource of 10 kv switches of the branch of pjsc «Rosseti Center»-«Orelenergo»
by: A. V. Vinogradov, et al.
Published: (2022-12-01) -
Photoconductive Semiconductor Switches: Materials, Physics, and Applications
by: Vincent Meyers, et al.
Published: (2025-01-01) -
Synthesis and Comparison of Soft-Switched Operating Modes of a Series Resonant Balancing Converter for Bipolar DC Grids
by: Sachin Yadav, et al.
Published: (2024-01-01) -
Trajectory Control Approach for Single-Stage Soft-Switching Grid-Tied Inverters
by: Seunghun Baek
Published: (2024-11-01) -
THE EFFECTIVENESS OF THE REPLACEMENT LOW-VOLTAGE SWITCHING DEVICES ON THE EXAMPLE OF INDUSTRIAL ENTERPRISE
by: A. V. Shagidullin
Published: (2017-12-01)