Effects in Service of the Staggered Construction of Cable-Stayed Bridges Built on Temporary Supports
Cable-stayed bridges can be rarely built on a single construction stage and staggered construction is commonly used. The effects of this staggered construction are not only economical as they might also play an important role in the structural behaviour in service. Despite of this importance, these...
Saved in:
| Main Authors: | Jose Antonio Lozano-Galant, Ignacio Payá-Zaforteza, Jose Turmo |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Riga Technical University Press
2015-09-01
|
| Series: | The Baltic Journal of Road and Bridge Engineering |
| Subjects: | |
| Online Access: | https://bjrbe-journals.rtu.lv/article/view/3446 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Modifications of the Stress-State of Cable-Stayed Bridges due to Staggered Construction of their Superstructure
by: Jose Antonio Lozano-Galant, et al.
Published: (2014-12-01) -
A Mixed Approach for Determination of Initial Cable Forces in Cable-Stayed Bridges and the Parameters Variability
by: Antonino Recupero, et al.
Published: (2015-06-01) -
Improvement of Stockbridge Damper Design for Cable-Stayed Bridges
by: Adél Olosz, et al.
Published: (2024-11-01) -
Probability Model and Reliability Analysis of Cable Stress for Cable-Stayed Bridge
by: Xiao-Yan Yang, et al.
Published: (2017-12-01) -
Development of Analytical Method for Cable-stayed Bridges Considering Local Damages Caused by Failure of Supporting Cables
by: Ahmed Ramadan Ahmed, et al.
Published: (2024-12-01)