Numerical Investigation on Dynamic Performance of a Bridge-Tunnel Transition Section with a Deep Buried Pile-Plank Structure
To address the track irregularity at transition zones between subgrade and rigid structures (bridge, tunnel, etc.), some common transition approaches, such as trapezoid subgrade, were adopted in many engineering areas. However, in regard to a mountainous area, the common transition approaches may no...
Saved in:
Main Authors: | Shuanglong Li, Limin Wei, Xiaobin Chen, Qun He |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8885535 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on Seismic Dynamic Response of Deep-Buried Tunnel Based on Tectonic Stress
by: Junjie He, et al.
Published: (2022-01-01) -
Lateral behavior of high-speed railway bridge pile foundation in soft soils under adjacent surcharge loads considering time-dependent characteristics
by: Shuanglong Li, et al.
Published: (2025-01-01) -
Research on the Algorithm for Composite Lining of Deep Buried Water Conveyance Tunnel
by: Fei Li, et al.
Published: (2021-01-01) -
Experimental and numerical investigation into pile spacing effects on the dynamic response of coastal pile foundation bridges considering current-wave-earthquake forces
by: Riyadh Alsultani, et al.
Published: (2025-01-01) -
Analysis of Surrounding Rock Pressure of Deep Buried Tunnel considering the Influence of Seepage
by: Qingchen Yao, et al.
Published: (2022-01-01)