Approach to Cost Control and Management for Prior Work of Capital Construction of Water Conservancy
Saved in:
Main Author: | 任玲 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2002-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47673657&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Pay Attention to Construction and Management of Water Conservancy Works and Maintain the Pearl River' s Healthy Life
by: SUN Jian-wei
Published: (2005-01-01) -
Fabricating Cost Management at the Construction Stage of Water Projects
by: LU Kangzhen
Published: (2006-01-01) -
Discussion on Management of Construction Project within the Limits of Channel Administration
by: 任玲
Published: (2003-01-01) -
Current Situation and Countermeasures of Linear Water Conservancy Project Construction Management
by: LI Yang
Published: (2023-01-01) -
Strengthening the Management of Project Alternation and Controlling the Cost of Public Works
by: LI Lin
Published: (2005-01-01)