Practice and Reflection on Joint Operation Scheme of Water Projects of Pearl River Basin:Flood Control in 2022

The joint operation scheme of water projects compiled year by year in the Pearl River Basin comprehensively considers the current situation of flood control in the basin and the practical experience of dispatching and continuously expands the water projects included in the scope of joint operation,w...

Full description

Saved in:
Bibliographic Details
Main Authors: HUANG Feng, HOU Guibing, LI Yuanyuan
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2023-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.05.002
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841536082293817344
author HUANG Feng
HOU Guibing
LI Yuanyuan
author_facet HUANG Feng
HOU Guibing
LI Yuanyuan
author_sort HUANG Feng
collection DOAJ
description The joint operation scheme of water projects compiled year by year in the Pearl River Basin comprehensively considers the current situation of flood control in the basin and the practical experience of dispatching and continuously expands the water projects included in the scope of joint operation,which optimizes and adjusts the existing dispatching modes of water projects.It has now become an important non-engineering measure for real-time flood control operation.In June 2022,the Pearl River Basin experienced a catastrophic flood,second only to the one in 1915.Under the guidance of the basin joint operation scheme of water projects,and based on the flood characteristics and flood control situation,the Longtan Reservoir plays a core role,jointly operated with various types of water projects such as the reservoirs in the main and tributary rivers,flood storage and detention areas,and floodgates.It coordinates the overall situation of the river basin and fully taps into the flood control and storage potentials of water projects,successfully dealing with the 2022 flood.This paper sorts out the application of the joint operation scheme of water projects during the flood period in 2022 and analyzes the application mode and dispatching effects of the joint operation of water projects under different water inflow situations.Then,the deficiencies of the flood control joint operation scheme of water projects exposed during the flood period are summarized.Discussions are made on the optimization space of flood control operation mode of water projects with the Longtan as the core.Finally,the countermeasures and suggestions for the further improvement of the joint operation scheme of the Pearl River Water Project are proposed.
format Article
id doaj-art-2f841ee8856d4101b5a28cd16a07c275
institution Kabale University
issn 1001-9235
language zho
publishDate 2023-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-2f841ee8856d4101b5a28cd16a07c2752025-01-15T02:22:37ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352023-01-014447639545Practice and Reflection on Joint Operation Scheme of Water Projects of Pearl River Basin:Flood Control in 2022HUANG FengHOU GuibingLI YuanyuanThe joint operation scheme of water projects compiled year by year in the Pearl River Basin comprehensively considers the current situation of flood control in the basin and the practical experience of dispatching and continuously expands the water projects included in the scope of joint operation,which optimizes and adjusts the existing dispatching modes of water projects.It has now become an important non-engineering measure for real-time flood control operation.In June 2022,the Pearl River Basin experienced a catastrophic flood,second only to the one in 1915.Under the guidance of the basin joint operation scheme of water projects,and based on the flood characteristics and flood control situation,the Longtan Reservoir plays a core role,jointly operated with various types of water projects such as the reservoirs in the main and tributary rivers,flood storage and detention areas,and floodgates.It coordinates the overall situation of the river basin and fully taps into the flood control and storage potentials of water projects,successfully dealing with the 2022 flood.This paper sorts out the application of the joint operation scheme of water projects during the flood period in 2022 and analyzes the application mode and dispatching effects of the joint operation of water projects under different water inflow situations.Then,the deficiencies of the flood control joint operation scheme of water projects exposed during the flood period are summarized.Discussions are made on the optimization space of flood control operation mode of water projects with the Longtan as the core.Finally,the countermeasures and suggestions for the further improvement of the joint operation scheme of the Pearl River Water Project are proposed.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.05.002joint operation of water projectsoperation schemewatershed floodPearl River Basin
spellingShingle HUANG Feng
HOU Guibing
LI Yuanyuan
Practice and Reflection on Joint Operation Scheme of Water Projects of Pearl River Basin:Flood Control in 2022
Renmin Zhujiang
joint operation of water projects
operation scheme
watershed flood
Pearl River Basin
title Practice and Reflection on Joint Operation Scheme of Water Projects of Pearl River Basin:Flood Control in 2022
title_full Practice and Reflection on Joint Operation Scheme of Water Projects of Pearl River Basin:Flood Control in 2022
title_fullStr Practice and Reflection on Joint Operation Scheme of Water Projects of Pearl River Basin:Flood Control in 2022
title_full_unstemmed Practice and Reflection on Joint Operation Scheme of Water Projects of Pearl River Basin:Flood Control in 2022
title_short Practice and Reflection on Joint Operation Scheme of Water Projects of Pearl River Basin:Flood Control in 2022
title_sort practice and reflection on joint operation scheme of water projects of pearl river basin flood control in 2022
topic joint operation of water projects
operation scheme
watershed flood
Pearl River Basin
url http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.05.002
work_keys_str_mv AT huangfeng practiceandreflectiononjointoperationschemeofwaterprojectsofpearlriverbasinfloodcontrolin2022
AT houguibing practiceandreflectiononjointoperationschemeofwaterprojectsofpearlriverbasinfloodcontrolin2022
AT liyuanyuan practiceandreflectiononjointoperationschemeofwaterprojectsofpearlriverbasinfloodcontrolin2022