To Speed up the Construction of Datengxie Water Junction and To Improve the Disaster Mitigation and Defense System in the Pearl River Basin
Saved in:
Main Authors: | HUANG Xiao-bing, CHEN Xiao-dong |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2009-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47663187&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Probe into the Flood Control and Disaster Mitigation Situation in the Pearl River Basin
by: XU Qian-qing
Published: (2006-01-01) -
Drought Disaster in the Pearl River Basin in 1963
Published: (2006-01-01) -
Flood Control and Disaster Mitigation Countermeasures in Pearl River Delta Area
by: CHEN Li-tang
Published: (2006-01-01) -
Control Soil Erosion to Speed up Construction of Eco_environment in the Pearl River Valley
by: 陈文贵
Published: (2002-01-01) -
Pearl River Basin Flood Risk Analysis
by: CHEN Xiao-dong
Published: (2006-01-01)