Slot development using the controlled blasting in the ore body "Borska reka"

The occurrence of deviations in the drilling of long blast holes can negatively impact the quality of blasting and safety of personnel and pillars in the room and pillar mining methods. The application of controlled blasting through a two-step blasting process for creating a compensation chamber (sl...

Full description

Saved in:
Bibliographic Details
Main Authors: Vojinović Ivica, Svrkota Igor, Stojanović Miloš, Šabaz Dragan, Rajković Radmilo
Format: Article
Language:English
Published: Mining and Metallurgy Institute, Bor 2024-01-01
Series:Mining and Metallurgy Engineering Bor
Subjects:
Online Access:https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2024/2334-88362402011V.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841554166694019072
author Vojinović Ivica
Svrkota Igor
Stojanović Miloš
Šabaz Dragan
Rajković Radmilo
author_facet Vojinović Ivica
Svrkota Igor
Stojanović Miloš
Šabaz Dragan
Rajković Radmilo
author_sort Vojinović Ivica
collection DOAJ
description The occurrence of deviations in the drilling of long blast holes can negatively impact the quality of blasting and safety of personnel and pillars in the room and pillar mining methods. The application of controlled blasting through a two-step blasting process for creating a compensation chamber (slot) is presented due to the occurrence of blast hole deviations. Initiation sequences of holes in the two-step blasting process were determined by surveying the holes and simulating blasting in the Datamine Aegis software. Blasting the lower and upper parts of the slot created a free space of approximately 840 m³ with an approximate specific explosive consumption of 2.25 kg/m³
format Article
id doaj-art-2d6e1d87dd84487e88af1005de38bd29
institution Kabale University
issn 2334-8836
2406-1395
language English
publishDate 2024-01-01
publisher Mining and Metallurgy Institute, Bor
record_format Article
series Mining and Metallurgy Engineering Bor
spelling doaj-art-2d6e1d87dd84487e88af1005de38bd292025-01-08T16:30:36ZengMining and Metallurgy Institute, BorMining and Metallurgy Engineering Bor2334-88362406-13952024-01-0120242112010.5937/mmeb2402011V2334-88362402011VSlot development using the controlled blasting in the ore body "Borska reka"Vojinović Ivica0https://orcid.org/0009-0006-3658-6922Svrkota Igor1https://orcid.org/0000-0002-3779-6327Stojanović Miloš2https://orcid.org/0000-0003-0044-5491Šabaz Dragan3https://orcid.org/0000-0002-1373-413XRajković Radmilo4https://orcid.org/0000-0001-5905-6613Mining and Metallurgy Institute, Bor, SerbiaMining and Metallurgy Institute Bor, SerbiaMining and Metallurgy Institute, Bor, SerbiaMining and Metallurgy Institute, Bor, SerbiaMining and Metallurgy Institute, Bor, SerbiaThe occurrence of deviations in the drilling of long blast holes can negatively impact the quality of blasting and safety of personnel and pillars in the room and pillar mining methods. The application of controlled blasting through a two-step blasting process for creating a compensation chamber (slot) is presented due to the occurrence of blast hole deviations. Initiation sequences of holes in the two-step blasting process were determined by surveying the holes and simulating blasting in the Datamine Aegis software. Blasting the lower and upper parts of the slot created a free space of approximately 840 m³ with an approximate specific explosive consumption of 2.25 kg/m³https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2024/2334-88362402011V.pdfcontrolled blastingslotroom and pillardatamine aegispowder factor
spellingShingle Vojinović Ivica
Svrkota Igor
Stojanović Miloš
Šabaz Dragan
Rajković Radmilo
Slot development using the controlled blasting in the ore body "Borska reka"
Mining and Metallurgy Engineering Bor
controlled blasting
slot
room and pillar
datamine aegis
powder factor
title Slot development using the controlled blasting in the ore body "Borska reka"
title_full Slot development using the controlled blasting in the ore body "Borska reka"
title_fullStr Slot development using the controlled blasting in the ore body "Borska reka"
title_full_unstemmed Slot development using the controlled blasting in the ore body "Borska reka"
title_short Slot development using the controlled blasting in the ore body "Borska reka"
title_sort slot development using the controlled blasting in the ore body borska reka
topic controlled blasting
slot
room and pillar
datamine aegis
powder factor
url https://scindeks-clanci.ceon.rs/data/pdf/2334-8836/2024/2334-88362402011V.pdf
work_keys_str_mv AT vojinovicivica slotdevelopmentusingthecontrolledblastingintheorebodyborskareka
AT svrkotaigor slotdevelopmentusingthecontrolledblastingintheorebodyborskareka
AT stojanovicmilos slotdevelopmentusingthecontrolledblastingintheorebodyborskareka
AT sabazdragan slotdevelopmentusingthecontrolledblastingintheorebodyborskareka
AT rajkovicradmilo slotdevelopmentusingthecontrolledblastingintheorebodyborskareka