Study on the Real-time Controlling System for Construction Schedule of Underground Cavern Groups
Saved in:
Main Authors: | 钟立华, 邱建安 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2001-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47672608&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Simulation Analysis of Surrounding Rock Stability of Three-dimensional Cross Underground Cavern Group
by: ZHOU Yong, et al.
Published: (2020-01-01) -
Flowchart of DEM Modeling Stability Analysis of Large Underground Powerhouse Caverns
by: Tao Wang, et al.
Published: (2020-01-01) -
Effect of Seismic Frequency Spectra on Surrounding Rock Damage Evolution of Large Underground Caverns
by: Yumin Zhang, et al.
Published: (2018-01-01) -
Design and Construction Schedule for Underground Powerhouse Excavation of Shenzhen Pump Storage Plant
by: 潘伟
Published: (2003-01-01) -
Prevention and Tackling of Mud Rock Flow in Underground Construction
by: 钟伟泉
Published: (2001-01-01)