Evaluating the behavior of the Balaroud earth fill dam during impoundment in the final construction stage
Increased demand for freshwater and climate change effects have shifted focus to water resource management, highlighting the crucial role of dams in addressing supply and demand challenges. One of the primary challenges associated with newly constructed dams is effectively monitoring them during the...
Saved in:
| Main Authors: | Soroush Esmaeili-zadeh, Babak Lashkar-Ara |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Razi University
2025-06-01
|
| Series: | Journal of Applied Research in Water and Wastewater |
| Subjects: | |
| Online Access: | https://arww.razi.ac.ir/article_3758_48398e75522a1afe2b00878ca68eb4d5.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Predictive Model for Estimating Reservoir Impounding Time Based on the Net Inflow and Storage Volume
by: Harimukti Rosita R., et al.
Published: (2025-06-01) -
Optimizing pore pressure prediction in earth dams through the integration of panel data and intelligent models
by: Behrang Beiranvand, et al.
Published: (2025-07-01) -
Scheduling strategies of cascade reservoirs under extreme drought conditions during the impoundment period: A case study of lower Jinsha River, China
by: Rongqi Zhang, et al.
Published: (2025-08-01) -
Reservoir impoundment alters surrounding plant physiological activities revealed by stable isotopes in tree rings
by: Lian Sun, et al.
Published: (2025-06-01) -
Effect of immersion height on coal mechanical properties and the mechanism of damage failure
by: Xiaobin Li, et al.
Published: (2025-05-01)