An Optimization Model for Tramp Ship Scheduling considering Time Window and Seaport Operation Delay Factors
The quantity of electrical coal transported through the tramp shipping network is increasing due to the high demands. This trend has increased the scheduling difficulty combined with the underdevelopment of the private thermal power plant port. The high coal consumption and low port storage capacity...
Saved in:
Main Authors: | Ang Yang, Yu Cao, Kang Chen, Qingcheng Zeng, Zigen Chen |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Journal of Advanced Transportation |
Online Access: | http://dx.doi.org/10.1155/2021/6650097 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
EFFICIENCY OF TRAMP FLEET OPERATING UNDER THE CONTRACTS OF AFFREIGHTMENT
by: Yuliia KOSKINA, et al.
Published: (2023-09-01) -
Mathematical Model and Algorithm for the Reefer Mechanic Scheduling Problem at Seaports
by: Jiantong Zhang, et al.
Published: (2017-01-01) -
THE PHENOMENON OF TRAMP AND THE AMERICAN SYSTEM OF SEPARATION OF POWERS
by: N. V. Molchakov, et al.
Published: (2018-05-01) -
A Synchronous Optimization Model for Multiship Shuttle Tanker Fleet Design and Scheduling Considering Hard Time Window Constraint
by: Zhenfeng Jiang, et al.
Published: (2018-01-01) -
Due-Window Assignment Scheduling with Variable Job Processing Times
by: Yu-Bin Wu, et al.
Published: (2015-01-01)