Estimation of the Efficiency of the Operation of The Production Gas Well and Transfer It to the Stage of Capital Repair
Introduction: The article discusses the reasons for shutting down production gas wells (PGW) and approaches to predicting the critical parameters in them to assess the need for transfer to the overhaul stage. The geological, technological and analytical stages of transferring wells to well workover...
Saved in:
| Main Authors: | R. A. Gasumov, E. R. Gasumov |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
North-Caucasus Federal University
2022-07-01
|
| Series: | Наука. Инновации. Технологии |
| Subjects: | |
| Online Access: | https://scienceit.elpub.ru/jour/article/view/61 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Features оf Carrying оut Repair аnd Restoration Works in Gas Wells of Western Siberia Fields at the Stage of Falling Production
by: R. A. Gasumov, et al.
Published: (2023-06-01) -
Numerical-analytical modeling of oil extraction from oil fields with a gas cap using horizontal wells with automatic history matching
by: D. V. Shevchenko, et al.
Published: (2024-04-01) -
The permanent temperature monitoring for flow rate quantification in production and injection wells
by: M. I. Kremenetskiy, et al.
Published: (2024-04-01) -
Fillers of plant origin to blocking compositions for well killing
by: Rustam Ramizovich Gasumov, et al.
Published: (2022-09-01) -
Liquid and Gas Corrected Permeability Correlation for Heterogeneous Carbonate Reservoir Rocks
by: Sadonya Jamal Mustafa, et al.
Published: (2020-10-01)