Analysis of Effects of Feilaixia Hydropower Station in Generating Operation on Yingde City
Saved in:
Main Author: | 毛革 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2004-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47668630&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of Operation of Feilaixia Hydropower Station in Generation Mode During Early Stage
by: 蔡旭东
Published: (2002-01-01) -
Review on Issues Relating to the Selection of Turbines for the Feilaixia Hydropower Station
by: YOU Zan-pei
Published: (2000-01-01) -
Design and Operation of Bulb Tubular Turbines for Baishiyao Hydropower Station
by: 杨类琪, et al.
Published: (2003-01-01) -
Treatment of Vibration Problem in Hydro-generator Group in Xiangshui Hydropower Station
by: BI Ren-you, et al.
Published: (2009-01-01) -
Current Vibration and Operation Dispatch of Discharging Sluice in Honghua Hydropower Station
by: ZHANG Zu-lin, et al.
Published: (2008-01-01)