APA (7th ed.) Citation

Wang, X., Chen, B., Xiao, Y., Liao, S., Ye, X., & Bai, J. Optimized Scheduling Model Considering the Demand Response and Sequential Requirements of Polysilicon Production. MDPI AG.

Chicago Style (17th ed.) Citation

Wang, Xi, Baorui Chen, Yuduo Xiao, Siyang Liao, Xi Ye, and Jiayu Bai. Optimized Scheduling Model Considering the Demand Response and Sequential Requirements of Polysilicon Production. MDPI AG.

MLA (9th ed.) Citation

Wang, Xi, et al. Optimized Scheduling Model Considering the Demand Response and Sequential Requirements of Polysilicon Production. MDPI AG.

Warning: These citations may not always be 100% accurate.