REWORK COST ON BUILDING PROJECTS IN THE SOUTH WESTERN PART OF NIGERIA

Right-first-time is a principle that evaluates the competence of firms, quality of product and the expertise of a professional. Rework is doing something at least one extra time due to nonconformance to requirements, could suggest the abovementioned parameter negatively either on organisation or in...

Full description

Saved in:
Bibliographic Details
Main Author: Olatunji Ayodeji Aiyetan
Format: Article
Language:English
Published: UJ Press 2014-05-01
Series:Journal of Construction Project Management and Innovation
Subjects:
Online Access:https://journals.uj.ac.za/index.php/JCPMI/article/view/55
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841555066981449728
author Olatunji Ayodeji Aiyetan
author_facet Olatunji Ayodeji Aiyetan
author_sort Olatunji Ayodeji Aiyetan
collection DOAJ
description Right-first-time is a principle that evaluates the competence of firms, quality of product and the expertise of a professional. Rework is doing something at least one extra time due to nonconformance to requirements, could suggest the abovementioned parameter negatively either on organisation or individual. Human beings are not perfect, based on this, errors occur that may lead to rework on site and should be accommodated adequately for an uninterrupted flow of construction activities and non-delay of delivery of projects. The south western part of Nigeria was the area of study. The quantitative and descriptive research approaches were used. The questionnaire survey and historical data were the two method used for the collection of data for the study. Simple statistical means were used for data analysis. The research findings indicate that incorrect lying of forming course, poor quality of concrete, poor plastering, and construction errors during excavation dominate relative to areas of rework. Therefore, the study suggests that in order to eliminate or reduced drastically the occurrence of rework on future projects, consideration should be given to the following: the setting aside of a sum of money equal to the value of 0.6 – 5.0% of initial contract sum, engagement of knowledgeable foremen or having regular training of foremen, the correct construction processes should be followed in the execution of construction activities, and materials that are of good quality only should be used for constructional purposes.
format Article
id doaj-art-24870a8bdeda48178c3fce916a33b9aa
institution Kabale University
issn 2223-7852
2959-9652
language English
publishDate 2014-05-01
publisher UJ Press
record_format Article
series Journal of Construction Project Management and Innovation
spelling doaj-art-24870a8bdeda48178c3fce916a33b9aa2025-01-08T06:14:27ZengUJ PressJournal of Construction Project Management and Innovation2223-78522959-96522014-05-014110.36615/jcpmi.v4i1.55REWORK COST ON BUILDING PROJECTS IN THE SOUTH WESTERN PART OF NIGERIAOlatunji Ayodeji Aiyetan0Department of Built Env., Fac. of Engr. and Inf. Techn., Central Univ. of Techn., Free State, South Africa Right-first-time is a principle that evaluates the competence of firms, quality of product and the expertise of a professional. Rework is doing something at least one extra time due to nonconformance to requirements, could suggest the abovementioned parameter negatively either on organisation or individual. Human beings are not perfect, based on this, errors occur that may lead to rework on site and should be accommodated adequately for an uninterrupted flow of construction activities and non-delay of delivery of projects. The south western part of Nigeria was the area of study. The quantitative and descriptive research approaches were used. The questionnaire survey and historical data were the two method used for the collection of data for the study. Simple statistical means were used for data analysis. The research findings indicate that incorrect lying of forming course, poor quality of concrete, poor plastering, and construction errors during excavation dominate relative to areas of rework. Therefore, the study suggests that in order to eliminate or reduced drastically the occurrence of rework on future projects, consideration should be given to the following: the setting aside of a sum of money equal to the value of 0.6 – 5.0% of initial contract sum, engagement of knowledgeable foremen or having regular training of foremen, the correct construction processes should be followed in the execution of construction activities, and materials that are of good quality only should be used for constructional purposes. https://journals.uj.ac.za/index.php/JCPMI/article/view/55Building project, Rework, final cost, Construction process
spellingShingle Olatunji Ayodeji Aiyetan
REWORK COST ON BUILDING PROJECTS IN THE SOUTH WESTERN PART OF NIGERIA
Journal of Construction Project Management and Innovation
Building project, Rework, final cost, Construction process
title REWORK COST ON BUILDING PROJECTS IN THE SOUTH WESTERN PART OF NIGERIA
title_full REWORK COST ON BUILDING PROJECTS IN THE SOUTH WESTERN PART OF NIGERIA
title_fullStr REWORK COST ON BUILDING PROJECTS IN THE SOUTH WESTERN PART OF NIGERIA
title_full_unstemmed REWORK COST ON BUILDING PROJECTS IN THE SOUTH WESTERN PART OF NIGERIA
title_short REWORK COST ON BUILDING PROJECTS IN THE SOUTH WESTERN PART OF NIGERIA
title_sort rework cost on building projects in the south western part of nigeria
topic Building project, Rework, final cost, Construction process
url https://journals.uj.ac.za/index.php/JCPMI/article/view/55
work_keys_str_mv AT olatunjiayodejiaiyetan reworkcostonbuildingprojectsinthesouthwesternpartofnigeria