Trial Design of a Truss Bridge Prefabricated Using a Rectangular Steel Tube—Ultra-High-Performance Concrete Composite
In order to promote the development of bridge assembly technology and accelerate the application of rectangular steel-tube–concrete composite truss bridges, this study focuses on the Yellow River Diversion Jiqing Main Canal Bridge as the engineering example and conducts a numerical analysis of a rec...
Saved in:
| Main Authors: | Shujie Shang, Lei Jiang, Yongquan Dong, Zhengbo Li, Runsheng Pei |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2024-12-01
|
| Series: | Applied Sciences |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2076-3417/14/23/11244 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Seismic Response of a Cable-Stayed Bridge with Concrete-Filled Steel Tube (CFST) Pylons Equipped with the Seesaw System
by: Panagiota Katsimpini, et al.
Published: (2024-10-01) -
Systematic Rehabilitation Techniques and Dynamic Analysis of Bridge Deck System with Concrete-Filled Steel Tube Arches
by: Jie Cai, et al.
Published: (2024-12-01) -
Investigation of the effect of impact load on concrete-filled steel tube columns under fire
by: Ali Golsoorat Pahlaviani, et al.
Published: (2020-09-01) -
Investigation of the effect of impact load on concrete-filled steel tube columns under fire
by: Ali Golsoorat Pahlaviani, et al.
Published: (2020-10-01) -
Experimental Research on End Joint of Steel-Concrete Composite Truss
by: Lingyu Zhou, et al.
Published: (2012-12-01)