THE PROSPECT OF MINIMISING PRODUCTION FLOW WASTE ON CONSTRUCTION SITES IN NIGERIA THROUGH THE LAST PLANNER® SYSTEM
Poor performance of construction projects is a re-occurring problem in Nigeria. Production flow waste (ranging from waiting time, material handling and over- production, among others) may be partly responsible for this problem. Meanwhile, very little is known about the role of the Last Planner Syst...
Saved in:
Main Authors: | Emmanuel Itodo DANIEL, Christine PASQUIRE, Oko John AMEH |
---|---|
Format: | Article |
Language: | English |
Published: |
UJ Press
2017-06-01
|
Series: | Journal of Construction Project Management and Innovation |
Subjects: | |
Online Access: | https://journals.uj.ac.za/index.php/JCPMI/article/view/122 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Collaborative planning of subcontractors using the Last Planner System: a case study on a gas subcontractor in repetitive housing projects
by: Xavier Brioso, et al.
Published: (2024-03-01) -
Fine Tuning of an Advanced Planner for Cognitive Training of Older Adults
by: Mauro Gaspari, et al.
Published: (2025-01-01) -
Environmental Monitoring and Assessment for Sustainable Construction Projects: Leveraging Lean Techniques
by: Ardra Suseelan and Senthil Vadivel. T.
Published: (2024-12-01) -
Aplikasi wedding planner dan analisis kelayakan guna meningkatkan income generating badan pengelola usaha Universitas Jambi
by: Agus Syarif, et al.
Published: (2023-09-01) -
IS THE CONCEPT OF WASTE UNIVERSAL? HANDLING BUILDING DEMOLITION BY-PRODUCTS IN THE CITY OF KANO, NIGERIA
by: Aminu Lawan ABDULLAHI, et al.
Published: (2018-06-01)