Redesign of Plastic Waste Processing Facility Layout at PT Inastek Using Computerized Relationship Layout Planning (Corelap) Method
Factory layout is the main foundation of the industrial world. A well-planned factory layout will help determine the efficiency and effectiveness of production activities and in some cases will also maintain the survival or success of a company. Based on the results of field observations and interv...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Universitas KH Abdul Chalim, Prodi Ekonomi Syariah
2024-12-01
|
| Series: | Indonesian Interdisciplinary Journal of Sharia Economics |
| Subjects: | |
| Online Access: | https://e-journal.uac.ac.id/index.php/iijse/article/view/5787 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1846110660188962816 |
|---|---|
| author | Aura Diva Shafa Dharma Rusindiyanto Rusindiyanto |
| author_facet | Aura Diva Shafa Dharma Rusindiyanto Rusindiyanto |
| author_sort | Aura Diva Shafa Dharma |
| collection | DOAJ |
| description |
Factory layout is the main foundation of the industrial world. A well-planned factory layout will help determine the efficiency and effectiveness of production activities and in some cases will also maintain the survival or success of a company. Based on the results of field observations and interviews that have been conducted, the problem faced by the company is the arrangement of the production floor layout that has poor flow, including workstations that have a relationship of material flow sequences that are placed far apart. This causes a lot of land area used and high OMH costs. One of the proposed methods that can be used to solve this problem is the Computerized Relationship Layout Planning (CORELAP) method. The CORELAP method was chosen to improve the facility's layout by producing a minimum material movement distance. In addition, this method allows for maximum area utilization, higher production capacity, and a more regular production flow. The total distance in the old layout is 39.25 meters and the new layout is 26.75, proving that the distance traveled by the proposed layout is more minimal meets the requirements of a proposed layout, and can reduce the company's OMH value.
|
| format | Article |
| id | doaj-art-202a7a44943142c0b0a3e65e89ccc108 |
| institution | Kabale University |
| issn | 2621-606X |
| language | English |
| publishDate | 2024-12-01 |
| publisher | Universitas KH Abdul Chalim, Prodi Ekonomi Syariah |
| record_format | Article |
| series | Indonesian Interdisciplinary Journal of Sharia Economics |
| spelling | doaj-art-202a7a44943142c0b0a3e65e89ccc1082024-12-23T16:01:04ZengUniversitas KH Abdul Chalim, Prodi Ekonomi SyariahIndonesian Interdisciplinary Journal of Sharia Economics2621-606X2024-12-0181Redesign of Plastic Waste Processing Facility Layout at PT Inastek Using Computerized Relationship Layout Planning (Corelap) MethodAura Diva Shafa Dharma0Rusindiyanto Rusindiyanto1Universitas Pembangunan Nasional Veteran Jawa Timur, Surabaya, IndonesiaUniversitas Pembangunan Nasional “Veteran” Jawa Timur, Surabaya, Indonesia Factory layout is the main foundation of the industrial world. A well-planned factory layout will help determine the efficiency and effectiveness of production activities and in some cases will also maintain the survival or success of a company. Based on the results of field observations and interviews that have been conducted, the problem faced by the company is the arrangement of the production floor layout that has poor flow, including workstations that have a relationship of material flow sequences that are placed far apart. This causes a lot of land area used and high OMH costs. One of the proposed methods that can be used to solve this problem is the Computerized Relationship Layout Planning (CORELAP) method. The CORELAP method was chosen to improve the facility's layout by producing a minimum material movement distance. In addition, this method allows for maximum area utilization, higher production capacity, and a more regular production flow. The total distance in the old layout is 39.25 meters and the new layout is 26.75, proving that the distance traveled by the proposed layout is more minimal meets the requirements of a proposed layout, and can reduce the company's OMH value. https://e-journal.uac.ac.id/index.php/iijse/article/view/5787RedesignLayoutCorelapARC |
| spellingShingle | Aura Diva Shafa Dharma Rusindiyanto Rusindiyanto Redesign of Plastic Waste Processing Facility Layout at PT Inastek Using Computerized Relationship Layout Planning (Corelap) Method Indonesian Interdisciplinary Journal of Sharia Economics Redesign Layout Corelap ARC |
| title | Redesign of Plastic Waste Processing Facility Layout at PT Inastek Using Computerized Relationship Layout Planning (Corelap) Method |
| title_full | Redesign of Plastic Waste Processing Facility Layout at PT Inastek Using Computerized Relationship Layout Planning (Corelap) Method |
| title_fullStr | Redesign of Plastic Waste Processing Facility Layout at PT Inastek Using Computerized Relationship Layout Planning (Corelap) Method |
| title_full_unstemmed | Redesign of Plastic Waste Processing Facility Layout at PT Inastek Using Computerized Relationship Layout Planning (Corelap) Method |
| title_short | Redesign of Plastic Waste Processing Facility Layout at PT Inastek Using Computerized Relationship Layout Planning (Corelap) Method |
| title_sort | redesign of plastic waste processing facility layout at pt inastek using computerized relationship layout planning corelap method |
| topic | Redesign Layout Corelap ARC |
| url | https://e-journal.uac.ac.id/index.php/iijse/article/view/5787 |
| work_keys_str_mv | AT auradivashafadharma redesignofplasticwasteprocessingfacilitylayoutatptinastekusingcomputerizedrelationshiplayoutplanningcorelapmethod AT rusindiyantorusindiyanto redesignofplasticwasteprocessingfacilitylayoutatptinastekusingcomputerizedrelationshiplayoutplanningcorelapmethod |