Study on Flood Season Staging of Different Stationsin Xijiang River Based on Fuzzy Set Analysis
The flood of the Xijiang River basin is formed by the heavy rain, with obvious seasonalvariation law, and the study of the flood season staging is of great significance to optimize theoperation of the reservoir and coordinate the contradiction between flood control and benefitpromotion. This paper s...
Saved in:
Main Authors: | WANG Yuhu, WANG Baohua, FAN Hongxia, HOU Guibing, LI Yuanyuan |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2020-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2020.04.002 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on River System Flood Forecasting Scheme for Longtan Hydropower Station Interval in Hongshui River
by: DU Yong, et al.
Published: (2024-01-01) -
Optimization and Rule Analysis of Drawdown Level before Flood Season of Longtan Hydropower Station
by: LIU Yongqi, et al.
Published: (2023-01-01) -
Study on Flood Season Staging in Longtan Reservoir Based on Fisher Optimal Dissection Method
by: LI Dongqin, et al.
Published: (2021-01-01) -
Research and Practice on the Influence of Hydropower Station Construction on River Connectivity in the Process of Urbanization
by: WANG Shenfang, et al.
Published: (2022-01-01) -
The Impact of Shuangjiangkou Hydropower Station on the Joint Dispatch of Power Generation and Navigation for Downstream Cascade Reservoirs
by: YANG Yi, et al.
Published: (2024-09-01)