Evaluation of Key Factors of Logistics Risks for Overseas EPC Projects
Correctly identifying and evaluating the logistics risks of EPC (engineering procurement construction) projects is conducive to strengthening the risk prevention and control of engineering projects. An evaluation index system for the logistics risk factors of overseas EPC projects was established, a...
Saved in:
Main Authors: | Jingshi He, Dai Han |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2022-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2022/4447399 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The Robustness and Sustainability of Port Logistics Systems for Emergency Supplies from Overseas
by: Yanyu Chen, et al.
Published: (2020-01-01) -
Decision-Making Evaluation and Optimization Strategies for Construction EPC Project Developers Utilizing BIM Technology
by: Yujie Wu, et al.
Published: (2024-01-01) -
Provable security EPC information service communication scheme for EPC network
by: Jing-feng LI, et al.
Published: (2013-08-01) -
Spatial distribution and influencing factors of China’s overseas farmland investment projects under the background of food security
by: Yameng Wang, et al.
Published: (2025-01-01) -
Profit Sharing Mechanism of Large EPC Project considering the Behavior of Fairness Concern
by: Huimin Li, et al.
Published: (2020-01-01)