Application of Long Duration River Bed Evolution Model in channel Improvement Project
Saved in:
Main Authors: | SHEN Yue-jun, SHI Ying-biao |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2005-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47668101&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
River Bed Evolution in Shenzhen Bay and its Effects on Wetland Ecological System
by: WANG Fu-yong, et al.
Published: (2009-01-01) -
Analysis of Technical Features of Environmental Impact Appraisal for Inland River Channel Improvement Project
by: 吴利桥, et al.
Published: (2004-01-01) -
Application of BIM Technology in Design of River Improvement Project
by: SHAN Qikuan, et al.
Published: (2022-01-01) -
Project of Upgrading Beijiang River(From Wushi Reach to Sanshui River Mouth) to Grade Ⅲ Navigation Channel
by: QIN Yi-guan, et al.
Published: (2010-01-01) -
Construction of Sheet Piles in Sections Built on Deep Mud Bed for Pearl River Embankment Project in Guangzhou
by: 郑航桅
Published: (2004-01-01)