Application of risk-based approach in switching operations preparation at Novovoronezh NPP

The article discusses one of the problematic issues of operating nuclear power plants - revenue losses caused by staff mistakes. Existing methods and approaches to reducing the number of such incidents are analyzed. Despite the efforts made, the problem remains relevant. One of the directions for re...

Full description

Saved in:
Bibliographic Details
Main Authors: A. A. Mozgovoj, I. S. Rukin, A. V. Lebedeva
Format: Article
Language:English
Published: Национальный исследовательский ядерный университет МИФИ 2023-06-01
Series:Глобальная ядерная безопасность
Subjects:
Online Access:https://glonucsec.elpub.ru/jour/article/view/202
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1846163175751286784
author A. A. Mozgovoj
I. S. Rukin
A. V. Lebedeva
author_facet A. A. Mozgovoj
I. S. Rukin
A. V. Lebedeva
author_sort A. A. Mozgovoj
collection DOAJ
description The article discusses one of the problematic issues of operating nuclear power plants - revenue losses caused by staff mistakes. Existing methods and approaches to reducing the number of such incidents are analyzed. Despite the efforts made, the problem remains relevant. One of the directions for reducing the number of equipment failures is the study and use of internal and external operational experience. A description is given of a system for preventing the recurrence of negative operating experience, developed at the Novovoronezh Nuclear Power Plant, which is used in preparation for switching equipment. The system is an information base, the information in which is structured by types of equipment used at the Novovoronezh Nuclear Power Plant, allowing only the information directly related to the upcoming switches to be communicated to the operational staff. Suggestions for its further improvement, taking into account the recommendations of the International Atomic Energy Agency, are considered. A forecast is given for the dynamics of reducing the number of violations after the introduction of this system into industrial operation.​
format Article
id doaj-art-1ab377dcddc346908666ef4b8bcc7df6
institution Kabale University
issn 2305-414X
2499-9733
language English
publishDate 2023-06-01
publisher Национальный исследовательский ядерный университет МИФИ
record_format Article
series Глобальная ядерная безопасность
spelling doaj-art-1ab377dcddc346908666ef4b8bcc7df62024-11-19T13:46:56ZengНациональный исследовательский ядерный университет МИФИГлобальная ядерная безопасность2305-414X2499-97332023-06-0102889610.26583/gns-2023-02-10167Application of risk-based approach in switching operations preparation at Novovoronezh NPPA. A. Mozgovoj0I. S. Rukin1A. V. Lebedeva2Филиал АО «Концерн Росэнергоатом» «Нововоронежская атомная станция»Филиал АО «Концерн Росэнергоатом» «Нововоронежская атомная станция»Филиал АО «Концерн Росэнергоатом» «Нововоронежская атомная станция»The article discusses one of the problematic issues of operating nuclear power plants - revenue losses caused by staff mistakes. Existing methods and approaches to reducing the number of such incidents are analyzed. Despite the efforts made, the problem remains relevant. One of the directions for reducing the number of equipment failures is the study and use of internal and external operational experience. A description is given of a system for preventing the recurrence of negative operating experience, developed at the Novovoronezh Nuclear Power Plant, which is used in preparation for switching equipment. The system is an information base, the information in which is structured by types of equipment used at the Novovoronezh Nuclear Power Plant, allowing only the information directly related to the upcoming switches to be communicated to the operational staff. Suggestions for its further improvement, taking into account the recommendations of the International Atomic Energy Agency, are considered. A forecast is given for the dynamics of reducing the number of violations after the introduction of this system into industrial operation.​https://glonucsec.elpub.ru/jour/article/view/202рискподготовка к выполнению переключенийнегативный опыт эксплуатациидифференцированный подходнарушенияриск-менеджментриск-ориентированныйэксплуатация аэсменеджмент качествандп
spellingShingle A. A. Mozgovoj
I. S. Rukin
A. V. Lebedeva
Application of risk-based approach in switching operations preparation at Novovoronezh NPP
Глобальная ядерная безопасность
риск
подготовка к выполнению переключений
негативный опыт эксплуатации
дифференцированный подход
нарушения
риск-менеджмент
риск-ориентированный
эксплуатация аэс
менеджмент качества
ндп
title Application of risk-based approach in switching operations preparation at Novovoronezh NPP
title_full Application of risk-based approach in switching operations preparation at Novovoronezh NPP
title_fullStr Application of risk-based approach in switching operations preparation at Novovoronezh NPP
title_full_unstemmed Application of risk-based approach in switching operations preparation at Novovoronezh NPP
title_short Application of risk-based approach in switching operations preparation at Novovoronezh NPP
title_sort application of risk based approach in switching operations preparation at novovoronezh npp
topic риск
подготовка к выполнению переключений
негативный опыт эксплуатации
дифференцированный подход
нарушения
риск-менеджмент
риск-ориентированный
эксплуатация аэс
менеджмент качества
ндп
url https://glonucsec.elpub.ru/jour/article/view/202
work_keys_str_mv AT aamozgovoj applicationofriskbasedapproachinswitchingoperationspreparationatnovovoronezhnpp
AT isrukin applicationofriskbasedapproachinswitchingoperationspreparationatnovovoronezhnpp
AT avlebedeva applicationofriskbasedapproachinswitchingoperationspreparationatnovovoronezhnpp