Exact Overlap Rate Analysis and the Combination with 4D BIM of Time-Cost Tradeoff Problem in Project Scheduling
Schedulers can compress the schedule of construction projects by overlapping design and construction activities. However, overlapping may induce increased total cost with the decrease of duration. To solve the concurrency-based time-cost tradeoff problem effectively, this paper demonstrates an overl...
Saved in:
| Main Authors: | Guofeng Ma, Lingzhi Zhang |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2019-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2019/9120795 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects
by: Ming Li, et al.
Published: (2014-01-01) -
An Exact Schedulability Test for Real-Time Systems with Abstract Scheduler on Multiprocessor Platforms
by: Natalia O. Garanina
Published: (2024-12-01) -
Analysis of BIM in the Whole-Process Cost Management of Construction Projects
by: Lirong Liu, et al.
Published: (2022-01-01) -
BIM and AI Integration for Dynamic Schedule Management: A Practical Framework and Case Study
by: Heap-Yih Chong, et al.
Published: (2025-07-01) -
Fuzzy Group Decision Making for Multiobjective Problems: Tradeoff between Consensus and Robustness
by: Jian Xiong, et al.
Published: (2013-01-01)