Redundancy Optimization of an Uncertain Parallel-Series System with Warm Standby Elements
The redundancy optimization problem is formulated for an uncertain parallel-series system with warm standby elements. The lifetimes and costs of elements are considered uncertain variables, and the weights and volumes of elements are random variables. The uncertain measure optimization model (UMOM),...
Saved in:
Main Authors: | Linmin Hu, Wei Huang, Guofang Wang, Ruiling Tian |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2018-01-01
|
Series: | Complexity |
Online Access: | http://dx.doi.org/10.1155/2018/3154360 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Fuzzy Availability Assessment for a Repairable Multistate Series-Parallel System
by: Linmin Hu, et al.
Published: (2015-01-01) -
Application of Redundancy and Standby Technology for BRAS in the Metropolitan Area Network
by: Xianfeng Wang, et al.
Published: (2013-09-01) -
Routing control method of hot standby BRAS in IP MAN
by: Huanyi WANG, et al.
Published: (2016-01-01) -
RETRACTED: Improving the standardization of wagon standby time at the sorting station
by: Butunov Dilmurod, et al.
Published: (2024-01-01) -
RAPID: Redundancy Analysis With Parallelized and Intelligent Distribution
by: Younwoo Yoo, et al.
Published: (2025-01-01)