Optimization and Rule Analysis of Drawdown Level before Flood Season of Longtan Hydropower Station

Longtan Hydropower Station is the controlled reservoir of the Hongshui River.It is of significance for flood control,water supply,and power safety to study the optimal drawdown level before flood seasons in this station.Based on analyzing the drawdown level and operation requirements of Longtan Hydr...

Full description

Saved in:
Bibliographic Details
Main Authors: LIU Yongqi, HOU Guibing, GAO Weishan, LI Yuanyuan, WANG Baohua, LI Peng
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2023-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.10.010
Tags: Add Tag
No Tags, Be the first to tag this record!