Optimization and Rule Analysis of Drawdown Level before Flood Season of Longtan Hydropower Station
Longtan Hydropower Station is the controlled reservoir of the Hongshui River.It is of significance for flood control,water supply,and power safety to study the optimal drawdown level before flood seasons in this station.Based on analyzing the drawdown level and operation requirements of Longtan Hydr...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2023-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.10.010 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|