On Selection of Pipe Shape and Determination of Calibre for the North Line of Shenzhen Water Diversion Project
Saved in:
Main Authors: | 柳立平, 徐建军 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2004-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47669670&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Approach to Operation Mode of Water Environment Comprehensive Improvement Project in Shenzhen
by: 柳立平
Published: (2004-01-01) -
Prove into the Shape Selection of Water Delivery through Underground Pressure in Dongjiang-Shenzhen Water Supply Project.
by: 黄建添
Published: (2001-01-01) -
Technical Problems of Tunneling of Water Diversion Project in East Shenzhen
by: 田安建
Published: (2001-01-01) -
IMPROVEMENT OF CALIBRATION OF CONE-SHAPED ROLLS OF THE PIERCING MILL OF THE PIPE-ROLLING SHOP
by: V. S. Korovin, et al.
Published: (2017-07-01) -
Selection of Types for Embankment and Revetment of Stage Ⅲ Improvement Project of Shenzhen River
by: 陈锦庆, et al.
Published: (2002-01-01)