Key Design Points of the Reserved Rail Transit Project in Xiong’an New Area Underground Integrated Transportation Hub

[Objective] In view of the inconsistency in the construction schedule of the large underground integrated transportation hub in Xiong’an New Area, it is necessary to conduct in-depth research on the key design points of the reserved rail transit projects in the construction of above-mentioned transp...

Full description

Saved in:
Bibliographic Details
Main Authors: LI Heyong, XING Jiayong, MAO Wei
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2025-01-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.015.html
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841543665216913408
author LI Heyong
XING Jiayong
MAO Wei
author_facet LI Heyong
XING Jiayong
MAO Wei
author_sort LI Heyong
collection DOAJ
description [Objective] In view of the inconsistency in the construction schedule of the large underground integrated transportation hub in Xiong’an New Area, it is necessary to conduct in-depth research on the key design points of the reserved rail transit projects in the construction of above-mentioned transportation hub, in order to reduce the impact of secondary construction and lower the difficulties, risks and investments in later stages. [Method] The basic profiles of hubs such as Xiong’an Intercity Station, Xiaoli Station and Financial Island Station in Xiong’an New Area are introduced. The necessity of reserving rail transit projects in underground integrated transportation hub is analyzed. The design concepts for the above projects are summarized, and their key design points are extracted. [Result & Conclusion] Key design points for the reserved rail transit project in the transportation hub are as follows: The system types and vehicle formations shall be determined based on the planning conditions; Reasonable station locations and station types shall be decided with the idea of overall optimization; Station and city integration shall be used as a strategy to coordinate urban and traffic functions;The layout plan of the hub shall be improved with the concept of integrated design; Following the principle of intensive and appropriate development, the phased construction of the hub shall be studied; The reserved and pre-embedded measures shall be coordinated for detailed implementation.
format Article
id doaj-art-14b81409093d4f3aa077f2fad37b6a34
institution Kabale University
issn 1007-869X
language zho
publishDate 2025-01-01
publisher Urban Mass Transit Magazine Press
record_format Article
series Chengshi guidao jiaotong yanjiu
spelling doaj-art-14b81409093d4f3aa077f2fad37b6a342025-01-13T08:04:42ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2025-01-01281869110.16037/j.1007-869x.2025.01.015Key Design Points of the Reserved Rail Transit Project in Xiong’an New Area Underground Integrated Transportation HubLI Heyong0XING Jiayong1MAO Wei2Urban Rail System Division, China Railway Design Corporation, 300142, Tianjin, ChinaGeneral Contracting Division, China Railway Design Corporation, 300308, Tianjin, ChinaUrban Rail System Division, China Railway Design Corporation, 300142, Tianjin, China[Objective] In view of the inconsistency in the construction schedule of the large underground integrated transportation hub in Xiong’an New Area, it is necessary to conduct in-depth research on the key design points of the reserved rail transit projects in the construction of above-mentioned transportation hub, in order to reduce the impact of secondary construction and lower the difficulties, risks and investments in later stages. [Method] The basic profiles of hubs such as Xiong’an Intercity Station, Xiaoli Station and Financial Island Station in Xiong’an New Area are introduced. The necessity of reserving rail transit projects in underground integrated transportation hub is analyzed. The design concepts for the above projects are summarized, and their key design points are extracted. [Result & Conclusion] Key design points for the reserved rail transit project in the transportation hub are as follows: The system types and vehicle formations shall be determined based on the planning conditions; Reasonable station locations and station types shall be decided with the idea of overall optimization; Station and city integration shall be used as a strategy to coordinate urban and traffic functions;The layout plan of the hub shall be improved with the concept of integrated design; Following the principle of intensive and appropriate development, the phased construction of the hub shall be studied; The reserved and pre-embedded measures shall be coordinated for detailed implementation.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.015.htmlxiong’an new areaunderground integrated transportation hubreserved rail transit project
spellingShingle LI Heyong
XING Jiayong
MAO Wei
Key Design Points of the Reserved Rail Transit Project in Xiong’an New Area Underground Integrated Transportation Hub
Chengshi guidao jiaotong yanjiu
xiong’an new area
underground integrated transportation hub
reserved rail transit project
title Key Design Points of the Reserved Rail Transit Project in Xiong’an New Area Underground Integrated Transportation Hub
title_full Key Design Points of the Reserved Rail Transit Project in Xiong’an New Area Underground Integrated Transportation Hub
title_fullStr Key Design Points of the Reserved Rail Transit Project in Xiong’an New Area Underground Integrated Transportation Hub
title_full_unstemmed Key Design Points of the Reserved Rail Transit Project in Xiong’an New Area Underground Integrated Transportation Hub
title_short Key Design Points of the Reserved Rail Transit Project in Xiong’an New Area Underground Integrated Transportation Hub
title_sort key design points of the reserved rail transit project in xiong an new area underground integrated transportation hub
topic xiong’an new area
underground integrated transportation hub
reserved rail transit project
url https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.015.html
work_keys_str_mv AT liheyong keydesignpointsofthereservedrailtransitprojectinxiongannewareaundergroundintegratedtransportationhub
AT xingjiayong keydesignpointsofthereservedrailtransitprojectinxiongannewareaundergroundintegratedtransportationhub
AT maowei keydesignpointsofthereservedrailtransitprojectinxiongannewareaundergroundintegratedtransportationhub