Lean Approach of Pharmaceutical Installations At Hospital ABC Purbalingga to Increase Pharmacy Service Efficiency

A good pharmacy quality services are intended to the pharmaceutical product which is well prepared, stored, distributed, dispensed and discarded. However, these days services are assessed through medication availability, waiting time and user satisfaction. Therefore, hospitals need to make continuou...

Full description

Saved in:
Bibliographic Details
Main Author: Rani Aulia Imran
Format: Article
Language:English
Published: UIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering Department 2022-07-01
Series:Journal of Industrial Engineering and Halal Industries
Subjects:
Online Access:https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/3530
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841558745692241920
author Rani Aulia Imran
author_facet Rani Aulia Imran
author_sort Rani Aulia Imran
collection DOAJ
description A good pharmacy quality services are intended to the pharmaceutical product which is well prepared, stored, distributed, dispensed and discarded. However, these days services are assessed through medication availability, waiting time and user satisfaction. Therefore, hospitals need to make continuous quality improvements to the process of service, facilities, utilities, and health workers. This research aims to propose improvements to hospital pharmacy services quality by using Lean approaches in reducing services waiting time of concoction medicine. A case study was at Hospital ABC at Central Java, conducted in February-April 2019. There is a crucial problem was the prescription drug waiting time of concoction medicine. This study begins with process flow analysis and waste identification by interviewing with stakeholders of the hospital. Non-value added and value-added activities been divided, then time measurement in each activity is carried out with a time study method, to get the actual time of compounding the drug. Current state flow was mapped using value stream mapping tools, and future state flow map was recommended. Using lean tools, value-added activities have been identified and process time in future state map optimized to 47%. By using 5-why’s root cause analysis, problems identified and improvement of visual management were recommended.
format Article
id doaj-art-1394db56a7b149258b411b78f4c9cc0e
institution Kabale University
issn 2722-8150
2722-8142
language English
publishDate 2022-07-01
publisher UIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering Department
record_format Article
series Journal of Industrial Engineering and Halal Industries
spelling doaj-art-1394db56a7b149258b411b78f4c9cc0e2025-01-06T05:54:18ZengUIN Sunan Kalijaga, Faculty of Science and Technology, Industrial Engineering DepartmentJournal of Industrial Engineering and Halal Industries2722-81502722-81422022-07-0131141910.14421/jiehis.35303156Lean Approach of Pharmaceutical Installations At Hospital ABC Purbalingga to Increase Pharmacy Service EfficiencyRani Aulia Imran0Jurusan Teknik Industri UnsoedA good pharmacy quality services are intended to the pharmaceutical product which is well prepared, stored, distributed, dispensed and discarded. However, these days services are assessed through medication availability, waiting time and user satisfaction. Therefore, hospitals need to make continuous quality improvements to the process of service, facilities, utilities, and health workers. This research aims to propose improvements to hospital pharmacy services quality by using Lean approaches in reducing services waiting time of concoction medicine. A case study was at Hospital ABC at Central Java, conducted in February-April 2019. There is a crucial problem was the prescription drug waiting time of concoction medicine. This study begins with process flow analysis and waste identification by interviewing with stakeholders of the hospital. Non-value added and value-added activities been divided, then time measurement in each activity is carried out with a time study method, to get the actual time of compounding the drug. Current state flow was mapped using value stream mapping tools, and future state flow map was recommended. Using lean tools, value-added activities have been identified and process time in future state map optimized to 47%. By using 5-why’s root cause analysis, problems identified and improvement of visual management were recommended.https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/3530pharmacyserviceswaiting timeconcoction medicinelean hospital
spellingShingle Rani Aulia Imran
Lean Approach of Pharmaceutical Installations At Hospital ABC Purbalingga to Increase Pharmacy Service Efficiency
Journal of Industrial Engineering and Halal Industries
pharmacy
services
waiting time
concoction medicine
lean hospital
title Lean Approach of Pharmaceutical Installations At Hospital ABC Purbalingga to Increase Pharmacy Service Efficiency
title_full Lean Approach of Pharmaceutical Installations At Hospital ABC Purbalingga to Increase Pharmacy Service Efficiency
title_fullStr Lean Approach of Pharmaceutical Installations At Hospital ABC Purbalingga to Increase Pharmacy Service Efficiency
title_full_unstemmed Lean Approach of Pharmaceutical Installations At Hospital ABC Purbalingga to Increase Pharmacy Service Efficiency
title_short Lean Approach of Pharmaceutical Installations At Hospital ABC Purbalingga to Increase Pharmacy Service Efficiency
title_sort lean approach of pharmaceutical installations at hospital abc purbalingga to increase pharmacy service efficiency
topic pharmacy
services
waiting time
concoction medicine
lean hospital
url https://ejournal.uin-suka.ac.id/saintek/JIEHIS/article/view/3530
work_keys_str_mv AT raniauliaimran leanapproachofpharmaceuticalinstallationsathospitalabcpurbalinggatoincreasepharmacyserviceefficiency